| Prio | Original string | Translation | — |
|---|---|---|---|
| Cost per sick day (£) | Cost per sick day (R) | Details | |
| Cost to replace an employee (£) | Cost to replace an employee (R) | Details | |
|
Cost to replace an employee (£) Cost to replace an employee (R)
You have to log in to edit this translation.
|
|||
| Cost per mat (£) | Cost per mat (R) | Details | |
| Avg wage per hour (£) | Avg wage per hour (R) | Details | |
| The average cost per mat is £75 | The average cost per mat is R75 | Details | |
|
The average cost per mat is £75 The average cost per mat is R75
You have to log in to edit this translation.
|
|||
Export as